WASTE / CONTAMINATED SITES, GEOTECHNICS, DECONSTRUCTION / BUILDING POLLUTANTS

Vöhringen Environment and Energy Park

Project details

Development of former brickworks and clay pit

The former site of a brickworks in Vöhringen was to be given a new development. An industrial estate with forward-looking ecological aspirations was to be created. In order to prepare the ground for the subsequent building construction, it was planned to raise the ground level of the former clay pit to a level prior to clay extraction. This required economical and environmentally friendly soil and mass management.

Services IBL:

  • Subsoil investigation and waste risk assessment
  • in the run-up to soil management:
    Planning. Tendering and expert supervision of the demolition of existing buildings
    Preliminary geotechnical investigation, subsoil assessment
    Environmental and waste analyses
    Clarification of explosive ordnance situation
    Creation of a soil management concept / authorisation planning for soil management
  • Expert geotechnical and waste monitoring
  • Technical services within the scope of monitoring (analytics, load plate tests, geotechnical laboratory tests)

SIMILAR PROJECTS

Framework contract for engineering and analytical services
In-depth recording of the conversion properties
Vitos Clinic Heppenheim, deconstruction
error: Content is protected !!!