Project details
Old brickworks Speyer, preparation for construction
The Erlus site in Speyer, formerly used for commercial purposes, in the direct vicinity of Speyer's lively old town, was to be converted into a residential area.
After IBL Umwelt- und Biotechnik had completed the examination of the buildings for pollutants and the planning of the deconstruction work, it took over the supervision of the deconstruction work. The deconstruction work began at the beginning of January 2013. In parallel, expert reports on the contaminated site situation prepared in advance were evaluated and supplementary investigations of suspected contaminated sites as well as waste technical investigations of the subsoil were carried out. Geotechnical investigations were carried out for the planned development and flood protection.
Services IBL:
- Waste, environmental and geotechnical engineering services
- Planning and tendering of building demolition / open space unsealing
- Specialist construction supervision of the dismantling
- Excavation support within the scope of the development
- Geotechnical site investigation and documentation
- Preparation of SiGe plan according to construction site ordinance and ASi plan according to BGR 128 (TRGS 524)