WASTE / CONTAMINATED SITES, GEOTECHNICS, DECONSTRUCTION / BUILDING POLLUTANTS

Making the Stumpf site in Bruchsal ready for development

Project details

Stumpf-Areal Bruchsal

Preparing for construction

In order to make the site ready for construction and to prepare for the new development, various regulatory measures were required at the new site, such as the demolition of buildings, infrastructure and sealing, as well as extensive clearing work and measures to restore the surface of the land for the new development.

Services of IBL Umwelt- und Biotechnik GmbH:

  • Waste assessment and classification of the expected excavated soil for recycling on the construction site
  • Soil management concept
  • Building inspection, examination of building fabric, pollutant register, deconstruction concept, planning of measures, preparation of tender documents
  • Supervision of demolition of buildings including clearing of trees and shrubs as well as unsealing of surfaces
  • Subsoil assessment and foundation recommendation

SIMILAR PROJECTS

Framework contract for engineering and analytical services
In-depth recording of the conversion properties
Vitos Clinic Heppenheim, deconstruction
error: Content is protected !!!