Project details
BAHNSTADT HEIDELBERG
As a result of the closure of the former freight and marshalling yard, the former railway area covering a total of 116 ha is to be restructured in terms of urban development to form the new district "Bahnstadt". In order to prepare the area, a variety of measures are to be carried out, such as the dismantling of buildings and technical facilities, the remediation of contaminated sites and soil improvement measures.
In the course of implementing the development work, an area-wide soil and mass management was realised, which essentially takes into account soil protection, waste, geotechnical, species protection and infrastructural concerns and requirements as well as the clearance of explosive ordnance. In total, more than 1,200,000 m3 of soil and other mineral masses will be moved during the preparation of the area.
Services:
- Waste and environmental engineering:
- Initial investigation of areas not previously investigated
- Excavation monitoring
- Sampling and analytics
- Waste assessment and classification
- Creation of an installation register
- Expert participation Preparation of a sales appraisal
- Environmental consulting services
- Geotechnics
- Soil and building material preparation
- Sampling and soil mechanics investigations
- Geotechnical construction supervision
- Geotechnical documentation
- Installation monitoring, including plate pressure tests
- External monitoring
- Expert participation Preparation of a sales appraisal
- Geotechnical consulting services
- Soil and building material preparation
- Sampling and soil mechanics investigations
- Geotechnical construction supervision
- Geotechnical documentation
- Installation monitoring, including plate pressure tests
- External monitoring
- Expert participation Preparation of a sales appraisal
- Geotechnical consulting services
- Explosive ordnance disposal
- Coordination of the Baden-Württemberg Explosive Ordnance Disposal Service and explosive ordnance disposal companies
- Organisation of the process and quality controls
- Preparation of evacuation plans to support evacuation measures in the event of bomb discoveries
- Documentation of all cleared areas by means of the creation of a geoinformation system
- Soil management
- Engineering planning for soil management (soil movements approx. 1.1 million m3)
- Elevation concepts / terrain models (approx. 60 ha)
- Mass planning
- Logistics planning/ phase planning